BSRIA updates Handover and O&M manuals
Contents |
[edit] Introduction
BSRIA has published a guide on the topic of Handover and O&M Manuals. The guide is part of BSRIA’s continuing effort to improve the built environment by researching and publishing technical guidance and other knowledge intended to promote best practice across the industry.
Colin Goodwin, BSRIA Technical Director, said, “This guide comes at an important time and is a significant step to improving the flow and quality of handover information from the construction team to the end client and building operators, and in essence supports the 'golden thread' for building services related information and documentation.”
[edit] Importance of operations
It is essential for buildings to operate in a safe, energy-efficient and cost-effective manner, supporting the aims of the business and the wellbeing of the occupants. However, the effective operation of a complex asset such as a building relies on the availability of accurate information about the asset itself.
Much of the information about the asset is delivered at handover of the construction project to the client. All too often, the information that the facilities management team is provided with is incomplete, inaccurate or poorly assembled, so it’s hard to find the information that’s needed. By following a clear process of identification and route planning, the client, designers and constructors can work together to produce a building that’s in much better shape from handover.
BSRIA’s guide, BG 79/2020, covers the various documentation delivered and activities carried out at handover of a building, with particular focus on operating and maintenance (O&M) manuals. The O&M manual is the key part of the information needed during operation of a building, and as such is discussed in the guide in detail.
The guide also covers other handover deliverables such as record drawings, certificates and BIM models, with a focus on legislative requirements and the need for handover documentation to reflect the O&M strategy of the building.
[edit] Soft Landings framework
This version of the guide replaces BG 1/2007 Handover, O&M Manuals and Project Feedback. It no longer includes guidance on the topic of Project Feedback; instead, it refers extensively to the Soft Landings process and in particular BSRIA guide BG 54/2018 Soft Landings Framework 2018.
The guidance is provided in an easy-to-follow format, making use of diagrams and checklists where possible. Editable versions of the appendices of the guide, including a model specification for O&M manuals and a checklist for documentation, can be downloaded by users of the guide for use on their projects.
BG 79/2020 was authored by BSRIA staff with the assistance of technical experts, and was supported by industry sponsors. The guide is available to download from the BSRIA Bookshop.
This article originally appeared under the title, 'BSRIA publishes updated guidance on Handover and O&M Manuals' on the BISRIA website. It was published in September 2020.
--BSRIA
[edit] Related articles on Designing Buildings
- BSRIA articles on Designing Buildings Wiki.
- BSRIA guidance on project information process BG 78/2021.
- Building owner's manual.
- Building users guide.
- Facilities management.
- Handover.
- Handover construction site to the client.
- Maintenance, repair and operations procurement.
- Soft landings.
[edit] External resources
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.